Vigonorte Cargo moves 2 CNC Machines from Qingdao to Leixões
Vigonorte Cargo had successfully moved 2 CNC machines in a 40"HC from Qingdao to Leixões. Each Machine had 5 meters long for 2.25 meters wide and 7 tons each. We had displaced the container to the ground level and use forklifts together to move the machines out of the container. Normally these machines arrive in OT containers, but due to shortage, we had decided to move to DRY HC to have a fast solution!
https://member.g7logisticsnetworks.com/member_profile?id=11431